Site Final | 8/18/2017 | 8/18/2017 | 8/18/2017 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/18/2017 | 8/18/2017 | 8/18/2017 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 5/26/2017 | 5/26/2017 | 5/26/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP on foundation No trackout. Stockpiles located in a good area. Soil has temporary stabilization with weeds. Water manholes have sunk into the road. The private road will need repair.
|