Site Final | 2/23/2018 | 2/28/2018 | 2/27/2018 | A | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 2/23/2018 | 2/23/2018 | 2/23/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 7/17/2017 | 7/17/2017 | 7/17/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Site Preparation | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Melissa Jannusch
|
|
|
Sign is posted. Okay to start. Left message with RP stating the ESC requirements for waste, concrete washout, and dust control.
Phone #: ###-####
|