Site Final | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 8/25/2017 | 8/25/2017 | 8/25/2017 | P | FAIL |
Andy J. Long
|
|
|
Request to dry wall crew and RP to clean up wash out material dumped on adjacent lot without containement.
Also discussed providing dry wall and painter washout facility/pit/box on Syringa jobsites. Lined pit with geotextile could be a solution to capture solids and let water drain through to infiltrate in ground...
|
Complaint Inspection | 6/28/2017 | 6/28/2017 | 6/30/2017 | P | PASS |
Andy J. Long
|
|
|
No trackout or sediment runoff from site. Trash contained, permit sign posted. Framing in progress.
Complaint actually about new project across street. Excess soil reportedly leveled out on adjacent lot. Will follow up.
|
Site Preparation | 6/15/2017 | 6/15/2017 | 6/16/2017 | P | PASS |
Melissa Jannusch
|
|
|