Random Inspection | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/21/2017 | 8/2/2017 | 8/3/2017 | A | PASS |
Andy J. Long
|
|
|
No activity at time of inspeciton. No violations observed, clean site.
|
Site Preparation | 7/21/2017 | 7/21/2017 | 7/21/2017 | A | PART |
Andy J. Long
|
|
|
Excavation conducted without site preparation inspection.
Perimeter vegetation preserved, no trackout or loose dirt leaving site. No excavation into hillside, flat and sandy site. No corrections requested.
|