Site Final | 7/31/2018 | 8/1/2018 | 8/2/2018 | A | PASS |
Andy J. Long
|
|
|
Corrections completed. Gatorgaurd wattle now backfilled and staked , top soil was raked, wattles removed. ESC permit approved for final.
One remaining pile of material on the downhill lot is to be removed. Syringa working with developer on it.
|
Site Final | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | PEND |
Andy J. Long
|
|
|
corrections needed: - pick up silt fence on adjacent lot - backfill gator guard flap and secure with stakes or pins (should be provided with wattle); upturn end on downhill section of wattle to avoid channeling water along sidewalk.
BLD okay for final with PW Hillside sign off; these corrections can be finished post BLD sign off
|
Site Final | 7/17/2018 | 7/18/2018 | 7/19/2018 | A | PEND |
Andy J. Long
|
|
|
Final Grading and Erosion control inspection. Please contact Steve to arrange meeting time. thanks, ###-####. steve Phone #: ###-#### Inspection requested via web by steve hanson
|
Site Final | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | NR |
Andy J. Long
|
|
|
Home complete, yard is landscaped. Sidewalk and gutter are clean. PW sign off complete.
ESC corrections needed before final. -rake, track, and install perimeter controls on the topsoil left just downhill from site. - install perimeter sediment control to contain irrigation runoff - clean up & remove discarded wattles left on site; straw could be raked on section of bare slope.
|
General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 | | PASS |
Michael Zawacki
|
|
|
Sod has been installed. Hillside below leading to next lot is about half exposed.
|
General Inspection | 7/2/2018 | 7/2/2018 | 7/2/2018 | | PASS |
Michael Zawacki
|
|
|
Site has been prepped for landscaping. All outside work looks complete. Some dirt on sidewalks.
|
General Inspection | 6/15/2018 | 6/15/2018 | 6/15/2018 | | PASS |
Michael Zawacki
|
|
|
Lot still exposed and contained. Redco was removing concrete from drive area earlier in week. Stucco washout has been removed.
|
General Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 | | PEND |
Michael Zawacki
|
|
|
Runoff from site, sand at bottom of hill.
|
General Inspection | 5/16/2018 | 5/16/2018 | 5/16/2018 | | FAIL |
Michael Zawacki
|
|
|
Something dark is still being washed out and dumped on ground. Sidewalk is stained from last improper washout.
|
General Inspection | 4/26/2018 | 4/26/2018 | 4/26/2018 | | FAIL |
Michael Zawacki
|
|
|
Stucco &/or paint was washed out on ground, ran down hill and into road and sidewalk, needs to be cleaned. Pavers stored on sidewalk, front of home is a mess. Left message with Mike, RP for Syringa.
|
General Inspection | 4/10/2018 | 4/10/2018 | 4/10/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Trash guy is on site loading trailer to haul away. Hillside BMPs in place. Home is being prepped for stucco
|
General Inspection | 3/16/2018 | 3/16/2018 | 3/16/2018 | | PASS |
Michael Zawacki
|
|
|
Site is contained. Hill below house is protected. No runoff or trackout.
|
General Inspection | 9/22/2017 | 9/29/2017 | 9/29/2017 | A | PART |
Andy J. Long
|
|
|
Need construction entrance/trackout prevention.
Re-assess perimeter controls.
|
Site Preparation | 9/22/2017 | 9/22/2017 | 9/22/2017 | P | PART |
Andy J. Long
|
|
|
WIP. No site preparation inspection requested.
No discharges, some minor trackout (access to site is now blocked off), and silt fence needs repair. Will inspect next week after backfill.
|