Site Final | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Andy J. Long
|
|
|
No construction acitivity or disturbed area at site. No ESC corrections needed. Project complete, BLD inspector working with contractor for BLD final. ESC permit finaled.
|
General Inspection | 5/7/2018 | 5/7/2018 | 5/7/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 | | PASS |
Michael Zawacki
|
|
|
Building complete, area surrounding paved. Building permit still open.
|