Site Final | 8/21/2018 | 8/21/2018 | 8/21/2018 | A | PASS |
Michael Zawacki
|
|
|
Exterior work completed, landscaping in progress. Site will need witches hats removed and a trash pickup before permits finalled.
|
Aging Inspection | 7/18/2018 | 7/18/2018 | 7/18/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Area is prepped for stucco. Plastic sheeting on ground. Trash box is full and some trash starting to pile. Drain inlets in alley are still protected.
|