Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC17-00904
StatusFinaled
Name RHETT COLLINS
Site Address 1301 S BIRD ST
Project NameCimarron Apartments
Customer Number 
ePlanReviewNo
Description
4-Plex: Build 20 multi-family buildings - 1 Six plex, 1 Duplex and 18 four plexes
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection5/29/20185/29/20185/29/2018 PASS
DetailsAndy J. Long
Cimarron ESC final inspection to be completed on main site permit, see ESC17-00102. BLD has temp. occupancy, no further ESC inspections on this permit.
DOC - Permit Finaled5/29/20185/29/20185/29/2018PPASS
DetailsAndy J. Long
General Inspection3/20/20183/20/20183/23/2018PPEND
DetailsAndy J. Long
WIP on corrections. RP/GC to pay re-inspection fee and schedule compliance inspection Monday AM.
Stop Work Order3/20/20183/20/20183/20/2018PDONE
DetailsAndy J. Long
Parcel hold/Stop Work Order for all City Inspection requests at Cimarron Apartments until site can show compliance with ESC permit conditions
Violations include:
.

- trackout to Bird and all along sidewalk and gutter
- inside of site extremely dirty
- need to remove all stockpiles off hard surfaces, store in area with perimeter sediement control


- pick up all loose trash, cover trash containers when not in use
BMP Violation1/9/20181/11/20181/11/2018AFAIL
DetailsAndy J. Long
corrections not complete

- trash uncontained in many areas
- muddy water all over interior parking lot due to multiple stockpiles and stagings areas not having perimeter control. Need to haul off dirt not being used.
- lots of mud in gutter and sidewalk along Bird


Corrections:
- pick up trash along the west perimeter of site, in particular the NW corner
- make plan to consolidate stockpiles or designate a material staging and dropoff area
- provide board walks for workers who park on Bird
- clean out all DI bags on Bird once water drains

Note, no trackout or discharges to Overland or Hackamore

Working with Dave with Summit and Rhett with Granite on improving site
BMP Violation1/8/20181/9/20181/9/2018PPEND
DetailsAndy J. Long
Summit Development and Granite working on corrections issued 1/8. Follow up to check on trash and road cleaning for 1/11 AM
BMP Violation1/8/20181/8/20181/8/2018PFAIL
DetailsAndy J. Long
Numerous violations at Cimarron:

- mud and dirt stockpiles placed throughout site, creating lots of mud within apartments and trackout to Bird.
- DIs on west side of Bird need maintenance
- gutter and sidewalk on Bird needs sweeping and cleaning
-pick up loose trash in plywood piles and put in the two large site dumpster

Rhett with Granite will start working on corrections, says Granite is still managing ESC and site work for the project. Correction notice also given to developer Dave Skaggs.