Site Final | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Andy J. Long
|
|
|
See ESC17-00138 and ESC17-00936 for remaining ESC corrections. This permit finaled.
|
General Inspection | 8/6/2018 | 8/6/2018 | 8/6/2018 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Curbing and sidewalk installed around perimeter. Storm drain has sediment protection installed. SWPPP info posted. No corrections requested.
|
General Inspection | 6/21/2018 | 6/21/2018 | 6/21/2018 | | PASS |
Michael Zawacki
|
|
|
Site dirtwork looks complete. Parking lot and curbing and sidewalks complete. SIte is still exposed and needs landscaping. Buildings are all framed and walled. No ESC issues at site. No SWPPP inspection logged in book since 4-9.
|
General Inspection | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PASS |
Andy J. Long
|
|
|
|