Aging Inspection | 8/10/2018 | 8/10/2018 | 8/10/2018 | | PASS |
Andy J. Long
|
|
|
Townhome complete and landscaped. Temporary BMPs in Harris Crossing will be removed under main subdivsion permit.
|
DOC - Permit Finaled | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 9/28/2017 | 9/28/2017 | 9/28/2017 | P | PASS |
Andy J. Long
|
|
|
RP notified project will soon start. Silt fence installed along Greenbelt to protect path and contain materials as well as on south side of project. Will monitor trackout and provide wheel wash as necessary. Concrete washout facilities are onsite & ready for use.
4 issued permits in this area on Caddis, 2 on Pheasant tail.
|