Aging Inspection | 8/17/2018 | 8/17/2018 | 8/17/2018 | | PASS |
Andy J. Long
|
|
|
Project complete. Harris Crossing temp BMPs to be removed under main site permit.
|
DOC - Permit Finaled | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/5/2017 | 10/10/2017 | 10/11/2017 | P | FAIL |
Michael Zawacki
|
|
|
Silt fence on front and rear of property requires maintenance, dirt is to high up fence. Front fence is under load and on verge of failing. No perimeter control on west side of project, dirt is getting onto sidewalk. Trackout onto Pheasant Tail. Lots of trash blowing around site. Inspected 10-9-17
|
General Inspection | 9/28/2017 | 10/4/2017 | 10/5/2017 | A | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 9/28/2017 | 9/28/2017 | 9/28/2017 | P | PASS |
Andy J. Long
|
|
|
RP notified project will soon start. Silt fence installed along Greenbelt to protect path and contain materials as well as on south side of project. Will monitor trackout and provide wheel wash as necessary. Concrete washout facilities are onsite & ready for use.
Harris Crossing in good condition, see main ESC permit ESC13-01279 also
Approved for construction.
|