Site Final | 9/7/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. No ESC temp BMPs left behind. Street and sidwewalk are free of loose dirt. ESC permit finaled.
|
Site Final | 9/4/2018 | 9/4/2018 | 9/5/2018 | P | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 9/3/2018 | 9/3/2018 | 9/4/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 | | PASS |
Michael Zawacki
|
|
|
4 row homes completed and landscaped.
|