Aging Inspection | 9/6/2018 | 9/6/2018 | 9/6/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Michael Zawacki
|
|
|
|
BMP Violation | 10/31/2017 | 10/31/2017 | 10/31/2017 | A | PEND |
Andy J. Long
|
|
|
Each site to provide own washout facility or have hauled offsite. Asbury Construction on notice for multiple violations and lack of housekeeping at projects in Millwell.
|
General Inspection | 10/27/2017 | 10/30/2017 | 10/30/2017 | P | FAIL |
Andy J. Long
|
|
|
No clean up or change at site.
Millwell new phase, still no washout facilities.
|
BMP Violation | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PEND |
Andy J. Long
|
|
|
Asbury Construction contact returned call, will clean up site and provide concrete washout.
Note: multiple site using adjacent lot as wahout. No washout provided in Millwell. Developer states that builders are to provide own washout.
|
BMP Violation | 10/27/2017 | 10/27/2017 | 10/27/2017 | A | FAIL |
Andy J. Long
|
|
|
No ESC permit sign posted No trash containment No valid RP Illicit concrete washout on adjacent lot
|