Site Final | 4/25/2018 | 4/25/2018 | 4/26/2018 | P | PASS |
Andy J. Long
|
|
|
Demo phase complete. Site now under supervision of ESI construction See ESC17-00847
|
Site Final | 4/4/2018 | 4/4/2018 | 4/10/2018 | P | NR |
Andy J. Long
|
|
|
Earthwork occuring for Adare Manor. Need to get ESC17-00847 issued.
|
General Inspection | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP on new building. No dirt leaving site. Dis installed.
|
Site Preparation | 9/22/2017 | 9/22/2017 | 9/22/2017 | A | PASS |
Andy J. Long
|
|
|
WIP on demolition project. No trackout, asphalt truck route preserved for hauling out demo materials. DIs on 23rd and 24th @ Fairview have sediment inlet bags installed. Permit sign posted on porta-pot
|