Site Final | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PASS |
Andy J. Long
|
|
|
|
Random Inspection | 11/14/2017 | 11/14/2017 | 11/14/2017 | P | FAIL |
Michael Zawacki
|
|
|
No permit displayed. WIP on framing. Lots of scrap and building waste laying around site. No front perimeter controls, washout was never cleaned up.
|
General Inspection | 10/27/2017 | 10/30/2017 | 11/3/2017 | P | FAIL |
Michael Zawacki
|
|
|
No peremit sign. Washout was put onto dirt. Oil leak out front. Talked to RP and he said they will take care of it.
|
BMP Violation | 10/19/2017 | 10/19/2017 | 10/27/2017 | P | PEND |
Andy J. Long
|
|
|
|
BMP Violation | 10/13/2017 | 10/13/2017 | 10/19/2017 | P | FAIL |
Andy J. Long
|
|
|
No permit sign, concrete washout uncontained. Evidence of uncleaned oil/grease spills on road. Gutter has some looose dirt and gravel in it.
NO contact with RP yet. Will followup
|
Conference | 9/19/2017 | 9/19/2017 | 9/22/2017 | A | CANC |
Andy J. Long
|
|
|
Call about dirt in the road
|