Site Final | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Michael Zawacki
|
|
|
Parking lot is paved and curb completed. Area still hasn't been landscaped. Stockpiles in adjacent parcel, surrounded by wattles.
|
Site Preparation | 10/11/2017 | 10/13/2017 | 10/13/2017 | A | PASS |
Andy J. Long
|
|
|
Greg ###-####; call to schedule
Reviewed parking lot installation BMPs. Wattles to line sidewalk. No wattle required on south side due to existing vegetation.
Work to begin next week. Approved for construction.
|