General Inspection | 7/25/2018 | 7/25/2018 | 7/25/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PART |
Andy J. Long
|
|
|
No trackout or sediment leaving site. No activity at time of inspection.
No ESC permit sign posted at site. New sign installed on trash box.
Adajacent lot being used for staging and stucco mixing. All debris and material must be cleaned when complete.
|
Random Inspection | 1/16/2018 | 1/16/2018 | 1/16/2018 | A | PASS |
Andy J. Long
|
|
|
No violations at site. WIP. Receiving storm drains to the west on Heartleaf have sediment filter bags.
|
General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Michael Zawacki
|
|
|
Area clean. Some trackout but bobcat currently operating. Foundation looks fresh.
|