DOC - Permit Finaled | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Site Final | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | NR |
Michael Zawacki
|
|
|
Inlet protection needs to be removed from parking lot, message sent to RP.
|
General Inspection | 4/19/2019 | 4/19/2019 | 4/19/2019 | | PART |
Michael Zawacki
|
|
|
Landscapers on site. Lot's of dirt and debris, needs to be swept when landscape work completed.
|
General Inspection | 3/11/2019 | 3/11/2019 | 3/19/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Andy J. Long
|
|
|
No trackout or discharges. Site perimeter sediment controls are still installed as well a chain link fencing. Parking lot is paved. Interior work in progress. No corrections.
Note: adjacent project has now started.
|
General Inspection | 1/22/2019 | 2/5/2019 | 2/6/2019 | P | PASS |
Michael Zawacki
|
|
|
Area still needs landscaping and stabalization. All current work is inside, no tracking or ESC issues.
|
General Inspection | 1/21/2019 | 1/21/2019 | 1/22/2019 | | PASS |
Andy J. Long
|
|
|
Perimeter sediment controls in good condition. No significant trackout. No corrections requested
|
General Inspection | 12/20/2018 | 12/20/2018 | 12/20/2018 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Workers are not parking in mud.
|
General Inspection | 11/19/2018 | 11/19/2018 | 11/19/2018 | | PASS |
Michael Zawacki
|
|
|
Inlet protection installed in new parking lot inlets, parking lot paved. Washout in good shape. No trackout or dust, site clean of garbage.
|
General Inspection | 10/19/2018 | 10/19/2018 | 10/19/2018 | | PASS |
Michael Zawacki
|
|
|
Getting forms installed for curbing, will probably pour Monday. New washout installed. Alleyway has been swept. No ESC issues at site.
|
General Inspection | 9/18/2018 | 9/18/2018 | 9/18/2018 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Alley is free from trackout.
|
General Inspection | 8/16/2018 | 8/16/2018 | 8/16/2018 | | PASS |
Michael Zawacki
|
|
|
Working on framing. Site is below grade of alley. Concrete washouts have been cleaned, will need a rebuild before next pour.
|
General Inspection | 6/20/2018 | 7/9/2018 | 7/10/2018 | A | PASS |
Michael Zawacki
|
|
|
WIP. Site is clean, washouts intact, no blowing trash.
|
General Inspection | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation and site work. Construction entrance and perimeter BMPs in good condition. Lined concrete washout on site.
No trackout or fugitive dust observed. Approved.
Duplicate ESC permit, ESC18-00194 has been closed.
|
Random Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on placing and compacting fill for building pad. No trackout or discharges from site. Permit posted, perimeter sediment controls installed. Approved.
|
Random Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | PASS |
Michael Zawacki
|
|
|
Currently working on grading and bringing in fill. No dewatering needed to take place.
|
General Inspection | 2/21/2018 | 3/1/2018 | 3/5/2018 | P | PASS |
Michael Zawacki
|
|
|
Perimeter BMPs and construction entrances in place. No work has begun. People are driving over wattle on old Eckert to get into neighboring site.
|
Site Preparation | 2/15/2018 | 2/20/2018 | 2/21/2018 | A | PASS |
Andy J. Long
|
|
|
Jill Phone #: ###-####
ESC permit sign posted. Perimeter sediment control heavy duty wattles are installed properly.
Rock construction entrance with geotextile lining properly install. Strom drains in DHE #16 have sediment protection. Will check in next week to see if any dewatering is anticipated.
Approved for construction.
|