DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled5/21/20195/21/20195/21/2019PPASS
DetailsMichael Zawacki
Site Final5/14/20195/14/20195/14/2019PNR
DetailsMichael Zawacki
Inlet protection needs to be removed from parking lot, message sent to RP.
General Inspection4/19/20194/19/20194/19/2019 PART
DetailsMichael Zawacki
Landscapers on site. Lot's of dirt and debris, needs to be swept when landscape work completed.
General Inspection3/11/20193/11/20193/19/2019 CANC
DetailsAndy J. Long
General Inspection3/19/20193/19/20193/19/2019PPASS
DetailsAndy J. Long
No trackout or discharges. Site perimeter sediment controls are still installed as well a chain link fencing. Parking lot is paved. Interior work in progress. No corrections.

Note: adjacent project has now started.
General Inspection1/22/20192/5/20192/6/2019PPASS
DetailsMichael Zawacki
Area still needs landscaping and stabalization. All current work is inside, no tracking or ESC issues.
General Inspection1/21/20191/21/20191/22/2019 PASS
DetailsAndy J. Long
Perimeter sediment controls in good condition. No significant trackout. No corrections requested
General Inspection12/20/201812/20/201812/20/2018 PASS
DetailsMichael Zawacki
Site is clean and contained. Workers are not parking in mud.
General Inspection11/19/201811/19/201811/19/2018 PASS
DetailsMichael Zawacki
Inlet protection installed in new parking lot inlets, parking lot paved. Washout in good shape. No trackout or dust, site clean of garbage.
General Inspection10/19/201810/19/201810/19/2018 PASS
DetailsMichael Zawacki
Getting forms installed for curbing, will probably pour Monday. New washout installed. Alleyway has been swept. No ESC issues at site.
General Inspection9/18/20189/18/20189/18/2018 PASS
DetailsMichael Zawacki
Site is clean and contained. Alley is free from trackout.
General Inspection8/16/20188/16/20188/16/2018 PASS
DetailsMichael Zawacki
Working on framing. Site is below grade of alley. Concrete washouts have been cleaned, will need a rebuild before next pour.
General Inspection6/20/20187/9/20187/10/2018APASS
DetailsMichael Zawacki
WIP. Site is clean, washouts intact, no blowing trash.
General Inspection6/20/20186/20/20186/20/2018PPASS
DetailsAndy J. Long
WIP on foundation and site work. Construction entrance and perimeter BMPs in good condition. Lined concrete washout on site.

No trackout or fugitive dust observed. Approved.



Duplicate ESC permit, ESC18-00194 has been closed.
Random Inspection4/6/20184/6/20184/6/2018PPASS
DetailsAndy J. Long
WIP on placing and compacting fill for building pad. No trackout or discharges from site. Permit posted, perimeter sediment controls installed. Approved.
Random Inspection3/28/20183/28/20183/28/2018PPASS
DetailsMichael Zawacki
Currently working on grading and bringing in fill. No dewatering needed to take place.
General Inspection2/21/20183/1/20183/5/2018PPASS
DetailsMichael Zawacki
Perimeter BMPs and construction entrances in place. No work has begun. People are driving over wattle on old Eckert to get into neighboring site.
Site Preparation2/15/20182/20/20182/21/2018APASS
DetailsAndy J. Long
Jill Phone #: ###-####

ESC permit sign posted. Perimeter sediment control heavy duty wattles are installed properly.

Rock construction entrance with geotextile lining properly install. Strom drains in DHE #16 have sediment protection. Will check in next week to see if any dewatering is anticipated.

Approved for construction.