Site Final | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Andy J. Long
|
|
|
Work complete. AIrplane parking pad complete. GRD finaled, no ESC corrections required.
|
General Inspection | 11/22/2017 | 12/13/2017 | 12/13/2017 | P | PASS |
Michael Zawacki
|
|
|
Working on final grading. Hoping to do first pour before end of year. Ground is frozen, no dust or trackout. Permit displayed on window of job trailer.
|
Site Preparation | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PASS |
Andy J. Long
|
|
|
Grading has started for new Skywest concrete apron for airplane parking. BMPs installed include heavy duty construction entrance and sediment control wattles in barrow ditch leading to onsite retention swale.
RP onsite. Provided ESC permit signs to post at fence at end of construction entrance of Skywest parking lot
|