Site Final | 9/6/2018 | 9/6/2018 | 9/10/2018 | P | PASS |
Andy J. Long
|
|
|
Work complete. Home is landscaped, stabilized, and cleaned. Temp BMPs (DI bag downhill on HV Road) will be removed under main site ESC permit.
|
General Inspection | 9/6/2018 | 9/6/2018 | 9/6/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/22/2018 | 8/22/2018 | 8/22/2018 | | PASS |
Michael Zawacki
|
|
|
Home is complete, landscapers on site.
|
Site Preparation | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
ESC permit sign posted. Receiving storm drain has inlet protection. Will use Blackrock washout located on south side of Warm Springs.
|