Site Final | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete, stabilized, and occupied. BLD finaled. No ESC corrections needed at site.
|
Tracking Control | 1/19/2018 | 1/23/2018 | 1/24/2018 | A | PASS |
Andy J. Long
|
|
|
Rock construction entrance installed from Irving to site as requested, access from Holmes has been Caution taped off. Workers parking on Irving per instructions from RP Vince, still very muddy around foundation.
BMPs installed, correction request to have crew push broom sweep the sidewalk apron and dirt on Irving and in front of site on Holmes.
|
General Inspection | 1/19/2018 | 1/19/2018 | 1/19/2018 | A | FAIL |
Andy J. Long
|
|
|
ESC permit sign posted on back fence, request to relocate closer to road.
Muddy access to both Holmes and Irving. Need to designated which entrance will be used and provide construction entrance.
Verbal correction request to RP Vince. Will check next Tuesday
|