Site Final | 1/2/2019 | 1/3/2019 | 1/8/2019 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. Storm drain sediment protection installed for ongoing construction in DHE #15-16
|
Aging Inspection | 1/1/2019 | 1/1/2019 | 1/2/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|