General Inspection | 1/25/2019 | 1/25/2019 | 1/28/2019 | | PASS |
Andy J. Long
|
|
|
See ESC17-01687 for all remaining ESC inspections for project
|
DOC - Permit Finaled | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | | PEND |
Andy J. Long
|
|
|
Corrections in progress. See ESC17-01687
|
General Inspection | 12/19/2018 | 12/19/2018 | 12/19/2018 | | PASS |
Michael Zawacki
|
|
|
Checking on suspected trackout. River St was clean, workers cleaning up during day. Lift was operating on Ash St, road needs to be swept.
|
General Inspection | 12/4/2018 | 12/4/2018 | 12/4/2018 | | PASS |
Michael Zawacki
|
|
|
Some freeze/thaw where site is exposed to sunlight. Cleaning any trackout as it happens. Will repair entrances when ground thaws.
|
General Inspection | 10/26/2018 | 10/26/2018 | 10/26/2018 | | PASS |
Michael Zawacki
|
|
|
Trench work complete in street, road patch. Curb installation has begun. Washout on site. CCDC ACHD project is on River St right in front of project. No ESC issues.
|