DOC - Permit Finaled | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Site Final | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | NR |
Michael Zawacki
|
|
|
Landscaping not completed.
|
Aging Inspection | 5/7/2019 | 5/7/2019 | 5/7/2019 | | PASS |
Michael Zawacki
|
|
|
Home completed, skid steer on site doing landscape work.
|
Aging Inspection | 3/6/2019 | 3/6/2019 | 3/6/2019 | | CANC |
Michael Zawacki
|
|
|
|
Site Final | 1/4/2019 | 1/4/2019 | 1/8/2019 | P | NR |
Andy J. Long
|
|
|
Not yet landscaped. Need to make sure there is no sedimment runoff to neighbor on the west side of home.
|
Aging Inspection | 1/4/2019 | 1/4/2019 | 1/4/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Tracking Control | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | CANC |
Andy J. Long
|
|
|
data entry error
|
General Inspection | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
Andy J. Long
|
|
|
BLD finaled, home complete but yard is not yet landscaped/stabilized. Wattle is installed on backyard to contain sediment from extending to vegetated hillside. No dirt leaving site, no corrections needed.
|
General Inspection | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Andy J. Long
|
|
|
|
Random Inspection | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | PEND |
Michael Zawacki
|
|
|
Wattle in rear is starting to be overtopped. Dirt is on sidewalk and road. Lumber scraps need to be removed.
|
Complaint Inspection | 4/24/2018 | 4/24/2018 | 4/25/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is very clean. Permit on display, foundation complete, properly constructed washout. Obvious signs of an oil spill or leak on road, cause not possible to determine. No dust or dirt leaving site.
|
General Inspection | 4/4/2018 | 4/9/2018 | 4/12/2018 | A | PASS |
Michael Zawacki
|
|
|
Sidewalk is clean. No dirt going over propert line but backfill piles are close. Foundation has been poured, washout correctly used onsite.
|
Complaint Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | FAIL |
Andy J. Long
|
|
|
- Sweep up street and sidewalk - install wattle along the east property line and remove any rock or mud clod close to neighboring property.
Crew arrived to complete sweeping. GC called to state he will keep it clean and have the wattle installed as requested..
|
Site Preparation | 4/2/2018 | 4/3/2018 | 4/4/2018 | A | PASS |
Andy J. Long
|
|
|