Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberESC18-00168
StatusFinaled
Name AMANDA FLESHMAN
Site Address 3214 E HEARTLEAF CT
Project Name 
Customer Number 
ePlanReviewNo
Description
Per Attached ESC Conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled8/6/20198/6/20198/6/2019PPASS
DetailsMichael Zawacki
Site Final7/2/20197/2/20197/2/2019PNR
DetailsMichael Zawacki
Landscaping not completed.
Aging Inspection5/7/20195/7/20195/7/2019 PASS
DetailsMichael Zawacki
Home completed, skid steer on site doing landscape work.
Aging Inspection3/6/20193/6/20193/6/2019 CANC
DetailsMichael Zawacki
Site Final1/4/20191/4/20191/8/2019PNR
DetailsAndy J. Long
Not yet landscaped. Need to make sure there is no sedimment runoff to neighbor on the west side of home.
Aging Inspection1/4/20191/4/20191/4/2019 CANC
DetailsAndy J. Long
rescheduled for site final
Tracking Control10/15/201810/15/201810/15/2018PCANC
DetailsAndy J. Long
data entry error
General Inspection10/15/201810/15/201810/15/2018PPASS
DetailsAndy J. Long
BLD finaled, home complete but yard is not yet landscaped/stabilized. Wattle is installed on backyard to contain sediment from extending to vegetated hillside. No dirt leaving site, no corrections needed.
General Inspection8/10/20188/10/20188/10/2018PPASS
DetailsAndy J. Long
Random Inspection6/1/20186/1/20186/1/2018PPEND
DetailsMichael Zawacki
Wattle in rear is starting to be overtopped. Dirt is on sidewalk and road. Lumber scraps need to be removed.
Complaint Inspection4/24/20184/24/20184/25/2018PPASS
DetailsMichael Zawacki
Site is very clean. Permit on display, foundation complete, properly constructed washout. Obvious signs of an oil spill or leak on road, cause not possible to determine. No dust or dirt leaving site.
General Inspection4/4/20184/9/20184/12/2018APASS
DetailsMichael Zawacki
Sidewalk is clean. No dirt going over propert line but backfill piles are close. Foundation has been poured, washout correctly used onsite.
Complaint Inspection4/6/20184/6/20184/6/2018PFAIL
DetailsAndy J. Long
- Sweep up street and sidewalk
- install wattle along the east property line and remove any rock or mud clod close to neighboring property.


Crew arrived to complete sweeping. GC called to state he will keep it clean and have the wattle installed as requested..
Site Preparation4/2/20184/3/20184/4/2018APASS
DetailsAndy J. Long
Brett Phone #: ###-####