Site Final | 6/11/2018 | 6/12/2018 | 6/12/2018 | P | PASS |
Michael Zawacki
|
|
|
Talked to Jill, she will remove BMPs. Trailer and masonary on site has nothing to do with the tank removal project.
|
Site Preparation | 2/16/2018 | 2/16/2018 | 2/20/2018 | P | CANC |
Michael Zawacki
|
|
|
call Jill to let know what time will be Phone #: ###-####
|
Site Preparation | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Michael Zawacki
|
|
|
Met with Jill on site. Material will be hauled away as excavated and clean fill brought in. No plans to stock pile on site.
|