Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC18-00310
StatusFinaled
Name SHELBY STROEBEL
Site Address 1779 N MOCKBEE PL
Project Name10-1 Sherman
Customer Number 
ePlanReviewNo
Description
As per ESC Conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection3/19/20193/19/20193/19/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled3/19/20193/19/20193/19/2019PPASS
DetailsMichael Zawacki
General Inspection3/4/20193/4/20193/4/2019 PART
DetailsMichael Zawacki
Still not landscaped. Pile of landscape rock dumped on sidewalk and street.
General Inspection2/13/20192/13/20192/13/2019 PASS
DetailsMichael Zawacki
Exterior completed, still needs landscaping. No runoff from site.
General Inspection1/28/20191/28/20191/28/2019 PASS
DetailsMichael Zawacki
Home exterior work completed, site still needs landscaping. No dirt running off from site.
General Inspection12/19/201812/19/201812/19/2018 PASS
DetailsMichael Zawacki
Exterior work on home completed. Gator guard protecting sidewalk. Lot still needs landscaping.
General Inspection11/29/201811/29/201811/30/2018PFAIL
DetailsAndy J. Long
Clean up all loose trash. Sweep sidewalk and gutter.
General Inspection8/23/20188/23/20188/23/2018PPASS
DetailsMichael Zawacki
Foundation completed, skid steer on site backfilling. Gator guard along perimeter. Sharing common access point with neighboring parcel.
General Inspection6/20/20186/20/20186/21/2018PPASS
DetailsAndy J. Long
WIP on two adjacent Canyon Crest homes. 3rd lot being used for concrete washout, which is lined and away from sidewalk. Permit signs posted. No trackout.

Correction needed:
- install wattle or silt fence below stockpile to prevent runoff to washout and street.

Notified RP-GC Dave
General Inspection6/13/20186/13/20186/13/2018PPASS
DetailsMichael Zawacki
Site excavated and foundation pouring has begun. Washout constructed and used. Backfill is mostly behind home site. No ESC issues.
Site Preparation6/6/20186/6/20186/6/2018PPASS
DetailsMichael Zawacki
Dave Phone #: ###-####
Met with contractors on site. Will use gatorguard along perimeters and clean as needed. Have permission to store backfill in neighboring lot, may haul off site if needed. Were made aware neighbors are monitoring site.
Site Preparation6/6/20186/6/20186/6/2018ACANC
DetailsMichael Zawacki