General Inspection | 12/26/2018 | 12/26/2018 | 12/26/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Andy J. Long
|
|
|
Frame and driveway complete. Trash contained, BMPs installed. Approved.
|
General Inspection | 6/6/2018 | 6/20/2018 | 6/21/2018 | P | PASS |
Michael Zawacki
|
|
|
Pump truck on site pouring concrete. Did not see any washout dumped on site. Site is fenced off to prevent unauthorized access, rock entrance installed. Silt fence still along rear perimeter. No ESC issues during inspection.
|
General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Andy J. Long
|
|
|
Follow up to site preparation.
Rock construction entrance installed as requested due to large parcel size. Workers using entrance as intended. No violations, approved.
|
Site Preparation | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Andy J. Long
|
|
|
Site ESC controls installed. Permit sign posted. Notified HHS foreman to have Re-inspection fee paid and SWO shall be removed.
|