Site Final | 8/12/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 8/9/2019 | 8/9/2019 | 8/12/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/24/2019 | 6/24/2019 | 6/24/2019 | | PASS |
Andy J. Long
|
|
|
|
BMP Violation | 5/6/2019 | 5/8/2019 | 5/14/2019 | A | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 5/6/2019 | 5/6/2019 | 5/6/2019 | | FAIL |
Michael Zawacki
|
|
|
Washout dumped, picture and cleanup request sent to listed RP. Follow up the 8th.
|
General Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 | | PASS |
Michael Zawacki
|
|
|
Hauling fill from 11th street side to 13th street side, turning around on common entrance, b room there to clean up dirt. All trash currently contained, will need to watch with the rain. Blowing dust in parking area across 13th street.
|
General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 | | PASS |
Andy J. Long
|
|
|
No trackout. Recieving MS4 have sediment protection. Vertical construciton in progress. No corrections.
|
General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation. No trackout. Permit sign and SWPPP info posted inside entrance. MS4 inlet at 13th & Myrtle has sediment protection instaled.
Ecopan concrete washout pans being utilized to contain washout. No corrrections requested.
|