Site Final | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Andy J. Long
|
|
|
Project complete. No ESC corrections needed, site clean and stabilized.
|
Site Preparation | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Andy J. Long
|
|
|
Addition is framed. No ESC issues at site. Approved.
|