General Inspection | 4/10/2019 | 4/10/2019 | 4/10/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Site Final | 3/20/2019 | 3/21/2019 | 3/26/2019 | P | NR |
Andy J. Long
|
|
|
Make sure runoff from backyard does not continue to cause erosion on the slope below. Home in process of finishing landscaping.
|
General Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 10/15/2018 | 10/18/2018 | 10/19/2018 | P | PART |
Michael Zawacki
|
|
|
Wattle has been installed across rills below riprap. No new riprap rock has been brough in or rills been filled.
|
General Inspection | 10/10/2018 | 10/15/2018 | 10/15/2018 | A | PASS |
Andy J. Long
|
|
|
Additional perimeter wattles installed as requested. More corrections to be completed after the backyard is regraded.
|
BMP Violation | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | FAIL |
Andy J. Long
|
|
|
Muddy runoff into rip rap drain channel.
Need to install perimeter sediment control along the south side of home between disturbance and drain channel.
verbal correction to HH RPs Les and Rollo
Follow up 10/15
|
Site Preparation | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Andy J. Long
|
|
|
Perimeter wattles installed. Permit sign posted. Subdivision BMPs installed.
Approved.
|
Random Inspection | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | FAIL |
Michael Zawacki
|
|
|
WIP with no BMPs. Left the RP a message to get it taken care of.
|