General Inspection | 5/20/2019 | 5/20/2019 | 5/20/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 5/3/2019 | 5/3/2019 | 5/8/2019 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Andy J. Long
|
|
|
Clayton Phone #: ###-####
Approved for construction. RP on duty. Iniitial BMPs installed. Sediment controls along the frontage to be installed after foundation excavation.
|