Site Final | 1/27/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/10/2019 | 12/10/2019 | 12/10/2019 | | PASS |
Michael Zawacki
|
|
|
Landscapers on site and are supposed to be finished today. Parking lot scheduled to be cleaned and striped. All trash is stored in garage. Only work remaining is to do carports.
|
General Inspection | 10/25/2019 | 10/25/2019 | 10/25/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean, trash box needs to be emptied soon.
|
General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 | | PASS |
Michael Zawacki
|
|
|
Landscaping walls alonge perimeter, still nees grass or stabilization. No esc issues
|
General Inspection | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Michael Zawacki
|
|
|
Masonary work in progress. Site still needs landscaping. Trash box in use and contained.
|
General Inspection | 7/3/2019 | 7/3/2019 | 7/3/2019 | | PASS |
Michael Zawacki
|
|
|
Inspected 7-2. Site is contained but not stabalized. Work is on interior.
|
BMP Violation | 5/3/2019 | 5/15/2019 | 5/14/2019 | A | PASS |
Michael Zawacki
|
|
|
Stucco crew finished. Parking area cleaned and being prepped for paving. Majority of trash picked up.
|
General Inspection | 5/3/2019 | 5/3/2019 | 5/3/2019 | | PART |
Michael Zawacki
|
|
|
Message sent to RP. Lots of small loose trash around site. Stucco area is a mess. Follow up scheduled.
|
General Inspection | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Michael Zawacki
|
|
|
One worker on site using mini excavator to move backfill back into foundation. Lined washout has been used on site. Foundation is poured. No current ESC issues.
|
General Inspection | 10/31/2018 | 11/1/2018 | 11/1/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation excavation. RP on duty. Permit posted. No corrections requested. Approved.
|
BMP Violation | 8/17/2018 | 8/20/2018 | 8/20/2018 | P | PEND |
Andy J. Long
|
|
|
follow up inspection
Site currently inactive. No new violations. Will continue to monitor and check for additional BMP installation.
|
Complaint Inspection | 8/17/2018 | 8/17/2018 | 8/17/2018 | A | FAIL |
Andy J. Long
|
|
|
No activity at time of inspection. Crew has been installing stormwater system this week
Met project manager Andy with Core Building. Issued warning about Site Preparation Inspection requirement. Next time Core will get fined if Site Prep not completed.
Corrections requested: - repost ESC permit signs, 1 on south entrance and one on the Greenbelt. - water truck is required for dust control. Must be onsite. - sweep gutter at end of work day today. - construction entrance should be installed after stormwater bed is covered/stabilized.
Receiving storm drain has existing DI bag installed, it is 1/4 full and cemented into the curb. Request to prevent trackout and dirt on roadway by daily sweeping. Recommended writing that into subcontractor contracts.
Follow up inspection scheduled 8/20
|