Site Final | 11/27/2018 | 11/27/2018 | 11/27/2018 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 10/11/2018 | 10/12/2018 | 10/12/2018 | A | PART |
Michael Zawacki
|
|
|
Rock entrance brough in. Still possible to go around the side, will need to monitor. Some trackout on sidewalk and apron.
|
Tracking Control | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PEND |
Michael Zawacki
|
|
|
No construction entrance. Area is muddy and flooded with concrete crew parking inside. Talke to owner and left message with RP.
|
BMP Violation | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | FAIL |
Michael Zawacki
|
|
|
No stabalized entrance onto maple grove. No vehicles moving at time and no blowing dust.
|
BMP Violation | 9/13/2018 | 9/14/2018 | 9/19/2018 | A | PEND |
Andy J. Long
|
|
|
no construction entrance, dusty
|
Site Preparation | 9/11/2018 | 9/12/2018 | 9/13/2018 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Michael Zawacki
|
|
|
Part of infill sub. Homes in multiple stages of completion. Sites are clean.
|