General Inspection | 12/4/2019 | 12/4/2019 | 12/4/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Site Final | 11/7/2019 | 11/19/2019 | 11/21/2019 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/7/2019 | 11/7/2019 | 11/7/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 10/23/2019 | 10/23/2019 | 10/25/2019 | | PASS |
Michael Zawacki
|
|
|
Landscaped and stable, still needs gutters.
|
General Inspection | 10/8/2019 | 10/8/2019 | 10/9/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/20/2019 | 9/20/2019 | 9/23/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/5/2019 | 9/5/2019 | 9/5/2019 | | PASS |
Michael Zawacki
|
|
|
Inspected 9-4. Home is about finished, no ESC issues.
|
General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 | | PASS |
Michael Zawacki
|
|
|
Silt fence and weed perimeter. Concrete steps in front completed.Lots of broken concrete piled in driveway. Crew on site sweeping sidewalk and cleaning gutter.
|
General Inspection | 8/6/2019 | 8/6/2019 | 8/7/2019 | | PASS |
Michael Zawacki
|
|
|
Most of front silt fence removed to make room for work on front steps. Sidewalk looks swept. Most remaining bark wattle has been destroyed.
|
General Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior work looks about completed. Silt fence and weeds surrounding site. One giant piece of plastic in backyard that should be cleaned up before it flies away.
|
General Inspection | 7/5/2019 | 7/5/2019 | 7/5/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/14/2019 | 6/20/2019 | 6/25/2019 | A | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Michael Zawacki
|
|
|
Spoke with stucco contractor and PJ. Will get stucco washout pit dug before work. No ESC issues.
|
General Inspection | 5/10/2019 | 5/10/2019 | 5/10/2019 | | PASS |
Michael Zawacki
|
|
|
Site is contained. Silt fence starting to show sow wear.
|
General Inspection | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | PEND |
Michael Zawacki
|
|
|
Building waste and trash need to be picked up.
|
General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PART |
Michael Zawacki
|
|
|
Perimeter silt fence needs repair. Some track out.
|
Site Preparation | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Andy J. Long
|
|
|
BMPs installed. Site ready for excavation. Silt fence perimeter. subdivsion has inlet protection and designated washout.
|