Site Final | 7/5/2019 | 7/11/2019 | 7/10/2019 | A | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 7/5/2019 | 7/5/2019 | 7/5/2019 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 7/13/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Andy J. Long
|
|
|
Adam Phone #: ###-####
Subdivsion storm drains have sediment protection installed. Above ground concrete washout pan provided. ESC permit sign posted at site.
Approved for construction.
|