Site Final | 6/7/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
Andy J. Long
|
|
|
No ESC corrections.
|
General Inspection | 6/7/2019 | 6/7/2019 | 6/7/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Andy J. Long
|
|
|
Project appears complete. Temporary sediment filter bags have been removed. Disturbed area has been hydroseeded and is revegetating. No corrections.
|
Site Preparation | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Andy J. Long
|
|
|
Terry - the Garden Artist
###-#### Thoren - Aloha Landscaping ###-####
BMPs installed per site plan. Review proper silt fence installation where stormwater runoff can flow off site on downhill side of project. Gator guard wattles install on area of access to back yard. Storm drain sediment filter bags installed on receiving inlets at Goldie & Outlook. Must be removed at end of job.
Retaining walls to placed in backyard must be approved by BLD inspector.
Permit sign board installed, ESC sign will come later this AM
|