General Inspection | 7/23/2020 | 7/23/2020 | 7/23/2020 | | PASS |
Michael Zawacki
|
|
|
Walls and foundations done on both buildings. All workers are currently in western building. Site has clean entrancer and is contained.
|
General Inspection | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | PASS |
Michael Zawacki
|
|
|
2 western most buildings have been completed and occupied for a while. Working on tilt up walls on west building. East building has foundation completed. Large lined washout on site and used. No issues at site.
|
General Inspection | 6/11/2020 | 6/11/2020 | 6/12/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/11/2020 | 5/11/2020 | 5/13/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/9/2020 | 4/9/2020 | 4/10/2020 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Western building has had foundation poured, lined washout used. Crew is on site finishing rebar on east pad. No issues at site.
|
General Inspection | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on grading new pads. Site still has fill that needs t be removed. Spoke with foreman, has new permit signs and will get them put up.
|
Tracking Control | 2/24/2020 | 2/27/2020 | 2/27/2020 | A | FAIL |
Michael Zawacki
|
|
|
Still has trackout on south bound fry.
|
General Inspection | 2/24/2020 | 2/24/2020 | 2/24/2020 | | FAIL |
Michael Zawacki
|
|
|
Trackout onto Fry, needs sweeping and improved entrance. Still has Jill on SWPPP board, told them to update on site info, inspector module has been updated. Follow up scheduled.
|
General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 | | PEND |
Michael Zawacki
|
|
|
Work has begun on east side. Site manager will forward me approvals to start before permits issued for second phase. Says GRD and old ESC reopened for site.
|
General Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | | PASS |
Michael Zawacki
|
|
|
West buildings are completed and everything stabilized. East hasn't begun, lot is secured.
|
General Inspection | 11/22/2019 | 11/22/2019 | 11/22/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | | PASS |
Michael Zawacki
|
|
|
2 western buildings completed, parking lot pavead and landscaped. East side is all fenced and has no activity.
|
General Inspection | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Michael Zawacki
|
|
|
Two building shells completed. Parking lot has been paved, landscapers on site.
|
General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is contained, no ESC issues.
|
General Inspection | 6/27/2019 | 6/27/2019 | 6/27/2019 | | PASS |
Michael Zawacki
|
|
|
Two shells on west of project completed, curbing complete to buildings, parking lot not paved. Some washout dumped in ditch a few hundred yards from site, no way to know where it came from.
|
General Inspection | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on tilt ups. Crew on site paving road, parking lots have curbing installed. No ESC issues.
|
General Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is below grade, all traffic routed through one entrance. Work on tilt up. No ESC issues.
|
General Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is contained. Working on concrete walls. WIll need to wash for blowing trash.
|
General Inspection | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Michael Zawacki
|
|
|
Sight is below grade. Work on slabs has begun, large lined washout on site. No trackout.
|
General Inspection | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
Michael Zawacki
|
|
|
Permit and SWPPP displayed at entrance. Rock entrances on both east and west sides. Work is currently waterline, excavation, and site prep grading. No dust or trackout. One lane of road has been removed for water line and sewer work.
|