Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC18-01128
StatusIssued
Name BRIAN MCCOY
Site Address 2574 S BEVERLY ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Construct four new warehouses with site modifications for new parking and loading docks. Total building area to be 133,00 SF (two 28,500 SF buildings and two 38,000 SF buildings).
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/23/20207/23/20207/23/2020 PASS
DetailsMichael Zawacki
Walls and foundations done on both buildings. All workers are currently in western building. Site has clean entrancer and is contained.
General Inspection6/22/20206/22/20206/22/2020PPASS
DetailsMichael Zawacki
2 western most buildings have been completed and occupied for a while.
Working on tilt up walls on west building. East building has foundation completed. Large lined washout on site and used. No issues at site.
General Inspection6/11/20206/11/20206/12/2020 CANC
DetailsAndy J. Long
General Inspection5/11/20205/11/20205/13/2020 CANC
DetailsAndy J. Long
General Inspection4/9/20204/9/20204/10/2020 PASS
DetailsMichael Zawacki
Site is clean and contained. Western building has had foundation poured, lined washout used. Crew is on site finishing rebar on east pad. No issues at site.
General Inspection3/9/20203/9/20203/9/2020PPASS
DetailsMichael Zawacki
WIP on grading new pads. Site still has fill that needs t be removed. Spoke with foreman, has new permit signs and will get them put up.
Tracking Control2/24/20202/27/20202/27/2020AFAIL
DetailsMichael Zawacki
Still has trackout on south bound fry.
General Inspection2/24/20202/24/20202/24/2020 FAIL
DetailsMichael Zawacki
Trackout onto Fry, needs sweeping and improved entrance. Still has Jill on SWPPP board, told them to update on site info, inspector module has been updated. Follow up scheduled.
General Inspection1/23/20201/23/20201/23/2020 PEND
DetailsMichael Zawacki
Work has begun on east side. Site manager will forward me approvals to start before permits issued for second phase.
Says GRD and old ESC reopened for site.
General Inspection12/23/201912/23/201912/23/2019 PASS
DetailsMichael Zawacki
West buildings are completed and everything stabilized. East hasn't begun, lot is secured.
General Inspection11/22/201911/22/201911/22/2019 CANC
DetailsMichael Zawacki
General Inspection10/22/201910/22/201910/22/2019 CANC
DetailsAndy J. Long
General Inspection9/19/20199/19/20199/19/2019 PASS
DetailsMichael Zawacki
2 western buildings completed, parking lot pavead and landscaped. East side is all fenced and has no activity.
General Inspection8/13/20198/13/20198/13/2019PPASS
DetailsMichael Zawacki
Two building shells completed. Parking lot has been paved, landscapers on site.
General Inspection7/11/20197/11/20197/11/2019PPASS
DetailsMichael Zawacki
Site is contained, no ESC issues.
General Inspection6/27/20196/27/20196/27/2019 PASS
DetailsMichael Zawacki
Two shells on west of project completed, curbing complete to buildings, parking lot not paved. Some washout dumped in ditch a few hundred yards from site, no way to know where it came from.
General Inspection5/9/20195/9/20195/9/2019PPASS
DetailsMichael Zawacki
WIP on tilt ups. Crew on site paving road, parking lots have curbing installed. No ESC issues.
General Inspection4/22/20194/22/20194/22/2019PPASS
DetailsMichael Zawacki
Site is below grade, all traffic routed through one entrance. Work on tilt up. No ESC issues.
General Inspection3/13/20193/13/20193/13/2019PPASS
DetailsMichael Zawacki
Site is contained. Working on concrete walls. WIll need to wash for blowing trash.
General Inspection1/29/20191/29/20191/29/2019PPASS
DetailsMichael Zawacki
Sight is below grade. Work on slabs has begun, large lined washout on site. No trackout.
General Inspection10/15/201810/15/201810/15/2018PPASS
DetailsMichael Zawacki
Permit and SWPPP displayed at entrance. Rock entrances on both east and west sides. Work is currently waterline, excavation, and site prep grading. No dust or trackout. One lane of road has been removed for water line and sewer work.