Site Final | 10/9/2019 | 10/10/2019 | 10/14/2019 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 10/9/2019 | 10/9/2019 | 10/9/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Michael Zawacki
|
|
|
Home completed, still needs landscaping.
|
Site Final | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | NR |
Michael Zawacki
|
|
|
Not landscaped.
|
Tracking Control | 10/15/2018 | 10/18/2018 | 10/19/2018 | A | PASS |
Michael Zawacki
|
|
|
Cul-de-sac and sidewalk clean. No one parked on lot.
|
Tracking Control | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | FAIL |
Andy J. Long
|
|
|
Significant trackout on culdesac. Need to make sure that site cleans up at the end of the day and after foundation work is complete.
Verbal correction request to RP Casey. He stated they would make sure it was cleaned up.Follow up scheduled 10/18 AM
|