General Inspection | 1/28/2020 | 1/28/2020 | 1/28/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 1/28/2020 | 1/28/2020 | 1/28/2020 | P | PASS |
Michael Zawacki
|
|
|
ESC18-00659 still open and is main site permit. All buildings completed, frontage along Fairview is still bare.
|
Site Final | 12/2/2019 | 12/13/2019 | 12/17/2019 | P | NR |
Andy J. Long
|
|
|
|
General Inspection | 12/2/2019 | 12/2/2019 | 12/2/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Site Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 9/3/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Michael Zawacki
|
|
|
check that frontage lot has been cleaned up (dumped washout, debris, trash, landscaping materials & pallets) and doesn't have trackout to Dawn
|
Conference | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | DONE |
Andy J. Long
|
|
|
Parcel hold removed, okay for BLD inspections.
- RP will begin clean up of lose trash and dirt on Dawn Street - Large material and dried concrete slurry will be removed Thursday. - pick up small trash and landscaping materials dumped in the bushes.
Follow up scheduled Friday AM
|
BMP Violation | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | FAIL |
Andy J. Long
|
|
|
Large amount of dumped concrete washout, landscape materials, and trackout from the frontage area of the King street apartments.
RP notified, cant get cleanup till next week. Parcel hold on 11783 King and re-inspection fee until it is cleaned up.
|
General Inspection | 7/16/2019 | 7/16/2019 | 7/16/2019 | | PASS |
Michael Zawacki
|
|
|
WIP on interior. Trash cleaned and contained. No issues.
|