Site Final | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Michael Zawacki
|
|
|
Curbing for parking lot is completed. ROad bed mix has been added, site not paved. Sidewalkks from lot to temple not installed.
|
Aging Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 | | PASS |
Michael Zawacki
|
|
|
Building is completed, not landscaped. Work on project next door, Shares common drive.
|
General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Michael Zawacki
|
|
|
Building is completed. Driveway not connected to street, not landscaped, still some stockpiled soil.
|
Aging Inspection | 12/26/2019 | 12/26/2019 | 12/26/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Andy J. Long
|
|
|
Home near completion. Not yet landscaped. No muddy runoff or trackout observed.
|
General Inspection | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Michael Zawacki
|
|
|
Framing in progress. Site is contained by tall grasses, no ESC issues.
|
General Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PASS |
Michael Zawacki
|
|
|
Framing has begun. Natural buffer left at site. One worker driving through grass to site, no stabalized entrance.
|