Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC18-01360
StatusFinaled
Name RICHARD WIGHT
Site Address 459 E SCHMEIZER LN
Project NamePool - Whight
Customer Number 
ePlanReviewNo
Description
undergroundpool
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/30/201811/30/201811/30/2018PPASS
DetailsMichael Zawacki
Some stone work remains for pool. All excavation and dirt work completed.
General Inspection10/2/201810/3/201810/3/2018APASS
DetailsAndy J. Long
dewatering inspection.

dewatering pit installed. Water discharging into pit is 1.7 NTU. Dishcharge out of wattle is overflowing through a straw wattle and bankside vegetation. No plume visible. Water upstream in creek is approx. 6 NTU.

Approved.
Conference10/3/201810/3/201810/3/2018APASS
DetailsMichael Zawacki
check on dewatering activity.
Dewatering was approved and no longer discharging turbid water into creek. Ground water is 1.6 NTU, Loggers Creek is 5.5 NTU.
Complaint Inspection10/2/201810/2/201810/2/2018APEND
DetailsAndy J. Long
potential dewatering of turbid water reported.

No turbid water discharge occuring at time of inspection. Settling structure constrcuted but full of turbid water and is not discharging. Submersible portable pump is placed perforated pipe and is discharging clear water to bank side vegetation intermittingly.

Reviewed dewatering requirements with homowner/GC Rick and Premier Pools project manager Scott. Explained receiving water is Logger's Creek and returns to Boise River downstream. No visible plume in receiving water is allowed.

Will construct new settling trench and allow infiltration and settling with outfall to existing grass and vegetation.

Follow up inspection scheduled for tomorrow AM.