General Inspection | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Site Preparation | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | PASS |
Michael Zawacki
|
|
|
Called in by Colby with CBH. Permits are posted, washout will be dug when excavator comes to site. Will get 3 witches hats for inlets. Perimeter controls not anticipated, sites lower than road. Will need to watch for trackout.
|