Site Final | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed:
- post permit signs on active projects - do maintenance on DI bags along Chinook. - no concrete washout
Wrong RP listed on permit.
Correction given to CBH Colby. He stated RP for South Fork is Joel Hirtle.
|