General Inspection | 11/15/2019 | 11/15/2019 | 11/18/2019 | | DONE |
Andy J. Long
|
|
|
Permits expired. Site stabilized. ESC permit closed.
|
DOC - Permit Finaled | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/31/2019 | 10/31/2019 | 11/1/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/16/2019 | 10/16/2019 | 10/18/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/26/2019 | 9/26/2019 | 9/30/2019 | | PASS |
Michael Zawacki
|
|
|
Driveway poured and landscaping installed.
|
General Inspection | 9/11/2019 | 9/11/2019 | 9/11/2019 | | PASS |
Michael Zawacki
|
|
|
Driveway has been prepped and has forms installed. Grass starting to grow on side lot.
|
General Inspection | 8/23/2019 | 8/23/2019 | 8/26/2019 | | PASS |
Michael Zawacki
|
|
|
Hydro seeder on site. Driveway is still gravel.
|
General Inspection | 8/8/2019 | 8/8/2019 | 8/8/2019 | | PASS |
Michael Zawacki
|
|
|
Driveway still gravel, some new landscaping. Some activity in lot next to home.
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PASS |
Michael Zawacki
|
|
|
No dirt leaving site. Driveway has been covered with clean gravel.
|
General Inspection | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | PART |
Michael Zawacki
|
|
|
Equipment staged on site. No BMPs installed, currently their is natural buffer on side of home with disturbance. Some trackout on sidewalk and apron from track steer.
|