Site Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | FAIL |
Michael Zawacki
|
|
|
Trackout onto road and sidewalk. Talked to RP of homes under construction and asked for cleanup.
|
General Inspection | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Michael Zawacki
|
|
|
No work begun.
|