Site Final | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PART |
Michael Zawacki
|
|
|
Message sent to RP. Some loose trash in yard, Kimball needs to have the gutter swept along west side.
|
General Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | FAIL |
Michael Zawacki
|
|
|
Lots of mud in front of home, message sent to RP.
|
Complaint Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | FAIL |
Andy J. Long
|
|
|
RP for tresidio Garry 2088035303
Multiple violations:
- Dumped washout that is not contained. - Trackout - No permits visible - wrong RP listed
RP is garry with Tresidio 208.803.5303
Corrections to clean up washout and trackout. Install new concrete washout that is lined.
Follow up Wednesday 2/6 in AM. If fail, investigation fees will be applied.
|