Site Final | 2/12/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Aging Inspection | 12/13/2019 | 12/13/2019 | 12/13/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Michael Zawacki
|
|
|
Foundation work completed, backfill filled in. Multiple lined washouts on site.
|