Site Final | 12/13/2019 | 12/16/2019 | 12/18/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 12/13/2019 | 12/13/2019 | 12/13/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Michael Zawacki
|
|
|
Foundation poured, building materials stored on site. Street and sidewalk have been swept and cleaned.
|