Site Final | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on block. No dumped washout. Most exterior work completed. No issues.
|
BMP Violation | 4/17/2020 | 4/20/2020 | 4/20/2020 | A | DONE |
Andy J. Long
|
|
|
have fine added to permit for dumped washout
Washout was reportedly committed by Knife River during sidewalk installation for phases 8-10. Investigation in progress
|
BMP Violation | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | FAIL |
Andy J. Long
|
|
|
Dumped washout. No lined pit observed.
2nd instance of dumped washout found on blackrock project (see also ESC19-01726)
Fine assessed to permit per concrete washout policy.
|
Aging Inspection | 3/19/2020 | 3/19/2020 | 3/19/2020 | | PASS |
Michael Zawacki
|
|
|
Hauling in material and doing lifts, strata was on site.
|