Site Final | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Michael Zawacki
|
|
|
Still needs landscaping. Wattle at edge of backyard, no dirt has gone down hill.
|
General Inspection | 1/15/2020 | 1/15/2020 | 1/15/2020 | | PASS |
Michael Zawacki
|
|
|
Home completed. Lot is snow covered cant tell if landscaped.
|
General Inspection | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Michael Zawacki
|
|
|
Home completed. Fence install has begun, site still needs to be landscaped.
|
General Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Michael Zawacki
|
|
|
Exterior of home completed, concrete work looks done. Lot isn't landscaped, wattle still along rear perimeter. Small area in corner where it looks like stucco has been dumped and maybe some washed out paint.
|
General Inspection | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP. Site is clean, BMPs still along back hill. No loose blowing trash. Met next door neighbor and he is happy with the work and people on site.
|
General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP. Rear perimeter has wattle and is protected. No loose trash at site. No dirt or dust leaving site.
|
General Inspection | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing, trusses stored on road. Rear hillside has wattle, no runoff. Site is clean.
|
Site Preparation | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Michael Zawacki
|
|
|
Wattle and washout installed. Stem walls have already been poured. Permit displayed. Some oil on road from pump truck, builder said he will get it cleaned up.
|