Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC19-00342
StatusFinaled
Name JACOB WILCOX
Site Address 3670 W QUAIL HOLLOW CT
Project NameMichael & Kathy Crowley Reside
Customer Number 
ePlanReviewNo
Description
Per attached ESC conditions. New SFH in foothills zone. Site Preparation inspection is required before excavation and after BMPs are installed. Stabilized construction access, concrete washout, receiving inlet sediment protection, and trash containment during all phases of construction is REQUIRED. Failure to re
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final1/27/20201/27/20201/27/2020PPASS
DetailsMichael Zawacki
Still needs landscaping. Wattle at edge of backyard, no dirt has gone down hill.
General Inspection1/15/20201/15/20201/15/2020 PASS
DetailsMichael Zawacki
Home completed. Lot is snow covered cant tell if landscaped.
General Inspection12/17/201912/17/201912/17/2019PPASS
DetailsMichael Zawacki
Home completed. Fence install has begun, site still needs to be landscaped.
General Inspection9/23/20199/23/20199/23/2019PPASS
DetailsMichael Zawacki
Exterior of home completed, concrete work looks done. Lot isn't landscaped, wattle still along rear perimeter. Small area in corner where it looks like stucco has been dumped and maybe some washed out paint.
General Inspection8/27/20198/27/20198/27/2019PPASS
DetailsMichael Zawacki
WIP. Site is clean, BMPs still along back hill. No loose blowing trash. Met next door neighbor and he is happy with the work and people on site.
General Inspection8/12/20198/12/20198/12/2019PPASS
DetailsMichael Zawacki
WIP. Rear perimeter has wattle and is protected. No loose trash at site. No dirt or dust leaving site.
General Inspection7/8/20197/8/20197/8/2019PPASS
DetailsMichael Zawacki
WIP on framing, trusses stored on road. Rear hillside has wattle, no runoff. Site is clean.
Site Preparation6/5/20196/6/20196/6/2019APASS
DetailsMichael Zawacki
Wattle and washout installed. Stem walls have already been poured. Permit displayed. Some oil on road from pump truck, builder said he will get it cleaned up.